The
scope of this project consisted of the design of N.W. 44th Street Roadway
Improvements from East of State Road 7 to the city limits within the
City of Lauderdale Lakes. The project, which was approximately
0.32 miles long, involved the design of the undeveloped section ofN.W. 44th Street into a 4-lane roadway connection to the existing
4-lane roadway in the City of Oakland Park. The services included
roadway plans, design of a 72-inch culvert, signing, marking plans
and a concrete block privacy walls. RJ Behar also performed construction
management services that included daily inspections, prepared daily
reports, monitored testing, reviewed shop drawings, reviewed change
order request, responded to requests for information and provided
certification of quantities for payment and final close out.